• Bedford-Stuy Brownstone

    Bedford-Stuyvesant, NY VIEW CASE STUDY

    Bedford-Stuy Brownstone

    Bedford-Stuyvesant, NY

    Complete gut and renovation of a classic 1915 Bedford-Stuyvesant Brownstone with Neo-Greco and Second Empire influences.

    View Project Details

  • DKN Ready Mix

    New York VIEW CASE STUDY

    DKN Ready Mix

    New York

    Relocated and constructed concrete plant to a new location.

    View Project Details

  • Our Lady of Mt. Carmel School

    Brooklyn, New York VIEW CASE STUDY

    Our Lady of Mt. Carmel School

    Brooklyn, New York

    Cristom provided pre-construction and construction services for school improvements that needed to be completed on a tight schedule in time for the school year.

    View Project Details

  • Katzman Produce Offices

    Bronx, NY VIEW CASE STUDY

    Katzman Produce Offices

    Bronx, NY

    Full gut and renovation of administrative headquarters for a major produce distributor located in the bustling Hunt’s Point Produce Terminal. waiting areas.

    View Project Details

  • Northside Shopping Center

    College Point, NY VIEW CASE STUDY

    Northside Shopping Center

    College Point, NY

    In constructing the Northside Plaza shopping center, Cristom was involved in the development and design which presented the first obstacle: A street that existed on the city’s plan but had never been built. The street had to be “demapped” from the street plan before construction could begin. An additional challenge presented itself later in the process: the soil characteristics at the rear of the shopping center were such that the rear of the building had to be constructed on piles.

    View Project Details

  • Arista 35 Condominiums

    Astoria, NY VIEW CASE STUDY

    Arista 35 Condominiums

    Astoria, NY

    Built from the ground up, Arista 35 is a five story, 22 unit luxury condominium building located in vibrant Astoria, NY.  It perfectly exemplifies the commitment to quality that can be found in everything that Cristom builds.

    Construction Highlights:

    • Arista 35 exterior is made of dramatic brick and stone facade

    • Spacious common rooftop with amazing views

    • Modern luxurious lobby, with high end finishes and virtual doorman

    • Kitchens with stainless steel appliances, solid wood cabinetry, granite counters, tile back splashes

  • Forty2East Condominiums

    East Williamsburg, NY VIEW CASE STUDY

    Forty2East Condominiums

    East Williamsburg, NY

    Built from the ground up luxury condominium development located in thriving East Williamsburg, NY.

    View Project Details

  • Freshdirect

    Long Island City, NY VIEW CASE STUDY

    Freshdirect

    Long Island City, NY

    Anytime you work with concrete it requires a special skill. And when your concrete work is supporting a sign visible to thousands of cars per day passing by on the LIE, the quality has to be built to last.

    CONSTRUCTION HIGHLIGHTS:

    • Provided 800 yards of concrete for pylon sign construction.

    • Orchestrated and monitored the footing/foundation system installation for a digital flat-screen pylon sign.

    • Coordinated a continuous pour, requiring more than 80 trucks of concrete to be delivered in a 6 hour period in order to maintain a monolithic pour.

  • Covanta

    West Babylon, NY VIEW CASE STUDY

    Covanta

    West Babylon, NY

    Installed and replaced leaching piping system for a waste to energy facility in Long Island, NY.

    Construction Highlights:

    • Ran 1,000 ft of leaching piping and dual containment piping from storage tanks to incinerator

    • Constructed a masonry building with tank and pump system to dispense leachate to incinerator

    • Provided stainless steel welding of all piping and HDPE pipe

  • Atlas Park

    Glendale, NY VIEW CASE STUDY

    Atlas Park

    Glendale, NY

    Three weeks, 60,000 square feet – that in a nutshell was the challenge Cristom faced in performing site work for the Shops at Atlas Park. The site had to be prepared in record time to accommodate a carnival and also allow the tenant to move in on schedule.

    CONSTRUCTION HIGHLIGHTS:

    • 60,000 sq. ft. complete parking lot renovation.

    • Installed site drainage, including on-site dry wells.

    • Performed all excavating and grading of area.

    • Paved and striped the lot and installed the parking lot lighting.

  • Bondee Group Office

    Whitestone, NY VIEW CASE STUDY

    Bondee Group Office

    Whitestone, NY

    5,000 SF Office Renovation

    Construction Highlights:

    • Renovated exterior facade with modern elements and sleek design

    • Reconstructed office layout

    • Added storage and relocated main entrance and lobby waiting area

    • Created isolated service area

    • Defined sales area separate from the rest of the departments

  • Commercial Building

    Jamaica, NY VIEW CASE STUDY

    Commercial Building

    Jamaica, NY

    This full gut and comprehensive renovation presented a challenge to Cristom since the original building dated from 1920. It ultimately left Cristom Construction with the necessity of upgrading the building entirely both structurally and mechanically.

    CONSTRUCTION HIGHLIGHTS:

    • Structural renovation and upgrades.

    • Mechanical renovation and upgrades.

    • Elevator upgrade.

    • Sprinkler system upgrades.

    • Complete utility service upgrade including fiber optic cables and new phone lines.

    • New building façade.

    • Building made handicap accessible including handicap entrance ramp.

    • Complete staircase replacement with step-up access to roof.

  • Safeway Construction

    Maspeth, NY VIEW CASE STUDY

    Safeway Construction

    Maspeth, NY

    8,000 sq ft warehouse and office extension with extensive sitework and poured concrete retaining wall system.

    Construction Highlights:

    • Re-purposed detiorating warehouse into a functioning office space with warehouse, storage and mechanical stations for customers specific work types

    • Provided custom tile flooring to represent streetscape

    • Provided sitework package that included covered parking, bin boxes and custom retaining wall with in-laid panels

  • image description

    Warehouse Building

    Maspeth , NY VIEW CASE STUDY

    Warehouse Building

    Maspeth , NY

    13,000 SF Warehouse in Maspeth, NY.

    Construction Highlights:

    • Replaced existing roof and substructure

    • Removed all existing partitions and equipment from prior renovations and customer build-outs

    • Created user-friendly office space, storage space and open warehouse space

  • image description

    Coca Cola Production Facility

    Maspeth, Queens VIEW CASE STUDY

    Coca Cola Production Facility

    Maspeth, Queens

    3 Bay and 10 Bay loading dock renovation and building addition. 15,000 SF office renovation.

    Construction Highlights:

    • United various office spaces originally located in separate areas throughout the facility into one central, cohesive space that is more productive for the facilities operations

    • Added a total of 13 loading bays and increased warehouse footprint, which allowed better vehicle traffic patterns for loading and unloading product

  • Coca Cola Distribution Center

    Maspeth, Queens VIEW CASE STUDY

    Coca Cola Distribution Center

    Maspeth, Queens

    30,000 SF Warehouse extension with gas/deisel backup power generator.

    Construction Highlights:

    • Extended building to 30 SF

    • Provided steel, masonry, roofing and utilities

    • Provided dunnage steel for backup power generator with gas piping
    View Full Project

  • Arc Remanufacturing

    Astoria, NY VIEW CASE STUDY

    Arc Remanufacturing

    Astoria, NY

    New warehouse building and cell phone tower.

    Construction Highlights:

    • Constructed foundation using piles, grade beams, tie beams with extensive rebar

    • Constructed 3 bay warehouse space with dunnage on roof for cell phone tower

    • Provided specialized equipment and installation for cell phone tower
    View Full Project