Coca Cola Production Facility

image description

3 Bay and 10 Bay loading dock renovation and building addition. 15,000 SF office renovation.

Construction Highlights:

• United various office spaces originally located in separate areas throughout the facility into one central, cohesive space that is more productive for the facilities operations

• Added a total of 13 loading bays and increased warehouse footprint, which allowed better vehicle traffic patterns for loading and unloading product