![](https://i0.wp.com/cristomconstruction.com/wp-content/uploads/2015/03/fresh-uncropped.jpg?fit=970%2C1019)
Anytime you work with concrete it requires a special skill. And when your concrete work is supporting a sign visible to thousands of cars per day passing by on the LIE, the quality has to be built to last.
CONSTRUCTION HIGHLIGHTS:
• Provided 800 yards of concrete for pylon sign construction.
• Orchestrated and monitored the footing/foundation system installation for a digital flat-screen pylon sign.
• Coordinated a continuous pour, requiring more than 80 trucks of concrete to be delivered in a 6 hour period in order to maintain a monolithic pour.