Installed and replaced leaching piping system for a waste to energy facility in Long Island, NY.
Construction Highlights:
• Ran 1,000 ft of leaching piping and dual containment piping from storage tanks to incinerator
• Constructed a masonry building with tank and pump system to dispense leachate to incinerator
• Provided stainless steel welding of all piping and HDPE pipe